SCOPE OF CONTRACT
Supply and install secondary support steelwork for supporting louvre panels to the roof of the newly constructed World Business Centre 4 situated alongside the perimeter road to Heathrow Airport.
The works were required on a fast track basis, which meant from start to finish the we turned the project around in 4 weeks, including site survey, production of fabrication details, manufacture at our Cardiff facility, delivery to site and installation.
Client:
Construction Specialties
Location:
Heathrow Airport, London
Duration:
4 Weeks