Loading...
 

   Bevan house, Penarth Road, Cardiff CF11 8UQ

   (029) 2070 2070

EFL Project:

World Business Centre

SCOPE OF CONTRACT

Supply and install secondary support steelwork for supporting louvre panels to the roof of the newly constructed World Business Centre 4 situated alongside the perimeter road to Heathrow Airport.

The works were required on a fast track basis, which meant from start to finish the we turned the project around in 4 weeks, including site survey, production of fabrication details, manufacture at our Cardiff facility, delivery to site and installation.

Client:

Construction Specialties

Location:

Heathrow Airport, London

Duration:

4 Weeks